Progress on Pavers


Although no bricks were laid, I did make some progress with the excavation of the dirt and relocated it to the ramp to the shed which was never to my liking. There’s a lot of dirt that needs to be removed. Well, it’s not a lot but with the tools I have (shovel and wheelbarrow), it’s a lot. A skid steer would have had it done in about 20 minutes. I should look into that.

We picked up a pork loin and carved 1-inch pork steaks out of it. Tenderized and friend and that’s good eats. Tomorrow is a carbon copy of today so we’ll be, hopefully, finishing up the brickwork.

Also, we got the part from Lectric so Sandy’s bike is operational once again. Damn mailman finally delivered it at 5:27 pm. Lazy bastard. I had already pulled the old display so it only took 10 minutes to put the new one on and we were off and riding.

Finally, the garage fridge one has been decommissioned. While it still works great, there’s no need to have that many refrigerators for two people.